May 2011, Vol. 238 No. 5
Projects
Dril-Quip To Supply Drilling Equipment For TLP
Dril-Quip, Inc. has been awarded a contract by Chevron U.S.A. Inc. to supply drilling equipment for the Big Foot Tension Leg Platform (TLP) to be installed in the Big Foot field located in the Walker Ridge area of the Gulf of Mexico.
Dril-Quip will provide subsea wellhead equipment and specialty connectors and tubulars for the Big Foot TLP.
Comments