February 2014, Vol. 241 No. 2
Projects
CH2M Hill Wins Energy East Contract
CH2M HILL was selected by TransCanada for front-end engineering and design (FEED) for the St. John Extension of the Energy East Project. The overall project will convert an 1,864-mile natural gas pipeline to transport oil from Alberta to eastern Canadian refineries and will require 932 miles of pipeline construction.
The Extension is a 248-mile, 42-inch pipeline that will be built in New Brunswick. This is the second major contract for CH2M HILL with TransCanada on the Energy East Project.
Comments