ROSEN Group to Supply Pre-Commissioning Equipment to SPIECAPAG for TAP

The ROSEN Group’s Field Products and Services division will provide effective equipment for pre-commissioning activities to SPIECAPAG by supplying 48’’ pre-commissioning tools, tracking equipment, as well as accessories to be used for the Trans Adriatic Pipeline. The equipment provided will be applied in the new pipeline in both Greece and Albania.
878 km long, the Trans Adriatic Pipeline will transport natural gas from the Shah Deniz II field in Azerbaijan to Europe. The pipeline will connect with the Trans Anatolian Pipeline (TANAP) at the Turkish-Greek border, cross Greece, Albania and the Adriatic Sea, before coming ashore in Southern Italy. In March 2016, the Trans Adriatic Pipeline selected SPIECAPAG as the Engineering, Procurement and Construction contractor for an 185 km lot in Greece as well as two lots in Albania (215 km in total).
Related News
Related News

- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- Energy Transfer to Build $5.3 Billion Permian Gas Pipeline to Supply Southwest
- Enbridge Sees High Demand to Expand 593-Mile Canada-to-U.S. Gulf Oil Pipeline
- Strike Pioneers First-of-Its-Kind Pipe-in-Pipe Installation on Gulf Coast with Enbridge
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- LNG Canada Start-Up Fails to Lift Gas Prices Amid Supply Glut
- Strike Pioneers First-of-Its-Kind Pipe-in-Pipe Installation on Gulf Coast with Enbridge
- Enbridge Sees High Demand to Expand 593-Mile Canada-to-U.S. Gulf Oil Pipeline
Comments