Construction Contract Awarded for European Gas Pipeline
Gascade, a subsidiary of BASF and Gazprom, has awarded a construction contract for six lots of the European Gas Pipeline (EUGAL) to the joint venture between Bonatti and Max Streicher. The pipeline will be powered by the Nord Stream 2, the gas transport network that connects Siberia to the heart of Europe via the Baltic Sea.

The EUGAL route will cover 300 miles (480 km) and have a capacity of 55 billion cubic meters annually. The 56-inch pipeline is divided into 14 lots. The scope of the work awarded to the joint venture includes the construction of the southern part of the EUGAL route, reaching the town of Deutschneudorf, Germany, on the border with the Czech Republic.
The EUGAL will run parallel to the OPAL gas pipeline and enhance the distribution of gas in the heart of the European Continent. Delivery on the double line sections is expected by the end of 2020.
Related News
Related News

- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- Traverse Pipeline Approved to Move 1.75 Bcf/d of Gas Along 160-Mile South Texas–Katy Route
- New Alternatives for Noise Reduction in Gas Pipelines
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- DOE Considers Cutting Over $1.2 Billion in Carbon Capture Project Funding
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Newsom Seeks to Aid Struggling Refiners Following Valero’s California Exit
Comments