Jupiter Extends Open Season for Crude Pipeline from Permian to Gulf
Jupiter Energy extended an open season until May 31 on a crude oil pipeline from the Permian to the Port of Brownsville. It is expected to be operational in fourth quarter of 2020.

The Jupiter Pipeline will be a 650-mile, 36-inch pipeline originating near Crane, Texas, and Gardendale/Three Rivers, Texas. It will be the only pipeline out of the Permian Basin with access to all three deep water ports in Texas (Houston, Corpus Christi and Brownsville).
It will have direct access to a fully capable VLCC loading facility off coast at Brownsville, where the Jupiter Brownsville Terminal will consist of up to 10 million barrels of storage, three docks and an offshore VLCC loading facility.
“We're very pleased with the results of the initial open season period for the Jupiter Pipeline,” said Albert Johnson, president of Jupiter Pipeline. “The supplemental period validates our belief that the interest for transportation commitments on the pipeline is as substantial as expected.”
Related News
Related News

- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- New Alternatives for Noise Reduction in Gas Pipelines
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Gazprom’s Grandeur Fades as Europe Moves Away from Russian Gas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
Comments