Fire Put Out on Tanker at Norway's Sture Oil Terminal
OSLO (Reuters) - A fire onboard an oil tanker at Norway’s Sture crude export terminal has been put out, the fire service told Reuters on Friday.

The fire broke out in the engine room of the Dubai Harmony tanker during loading at the Equinor oil terminal on Norway’s west coast, according to rescue services and police. The terminal receives oil from several offshore facilities in the North Sea via pipelines.
No one was injured, and the terminal’s output was not affected by the incident, although there was a partial evacuation of staff.
“The head of the response team on the site confirms that the fire was put out at 1257 CET (1057 GMT),” Trine Sommerlade, fire brigade spokeswoman, said in a text message to Reuters.
The fire broke out while the vessel was docked, with 23 crew on board.
“The incident happened during loading of oil from Sture,” said a spokesman for Equinor, the terminal’s operator, adding that the fire did not affect the terminal’s output. Equinor received the first report of the fire at 1102 CET (0902 GMT). Refinitiv Eikon AIS data showed the Dubai Harmony as the only ship docked at the Sture oil terminal. The Aframax-type ship can carry up to 115,340 deadweight tonnes, AIS data showed.
The ship’s owner, Dubai Navigation Corp, said it was unclear what caused the fire.
The Sture oil terminal receives crude oil from the following North Sea fields: Oseberg, Grane, Edvard Grieg and Svalin, among others.
Related News
Related News

- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- U.S. Moves to Block Enterprise Products’ Exports to China Over Security Risk
- 208-Mile Mississippi-to-Alabama Gas Pipeline Moves Into FERC Review
- Strike Pioneers First-of-Its-Kind Pipe-in-Pipe Installation on Gulf Coast with Enbridge
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- LNG Canada Start-Up Fails to Lift Gas Prices Amid Supply Glut
- Kinder Morgan Gas Volumes Climb as Power, LNG Demand Boost Pipeline Business
Comments