Red Butte Pipe Line Announces Open Season
(P&GJ) — Red Butte Pipe Line has announced an open season to solicit shipper commitments for the refurbishment and overhaul of a Wyoming pipeline.
The pipeline runs 8 miles between the Red Butte Gebo Station located in Hot Springs County, Wyoming to Chatham Station located in Washakie County, Wyoming.
Upon a showing of significant shipper interest, the Pipeline Project will be capable of providing up to 5,000 barrels per day of transportation service for petroleum meeting the Carrier’s common stream (API gravity between 30º and 50º, with an upper sulfur content limit of 0.42%).
The deadline for submitting bids in the open season is September 7, 2020 but may be extended at Carrier’s sole discretion.
Red Butte is a 495-mile crude oil pipeline system across the Big Horn and Wind River Basins.
Red Butte is currently the largest pipeline gathering asset transporting crude oil out of the Big Horn and Wind River Basins to Casper, Wyoming.
The system has two delivery points, multiple truck loading stations, and over 800,000 barrels of storage along the system.
For additional information, please visit www.scmidstream.com.
Related News
Related News

- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- U.S. Moves to Block Enterprise Products’ Exports to China Over Security Risk
- Strike Pioneers First-of-Its-Kind Pipe-in-Pipe Installation on Gulf Coast with Enbridge
- 208-Mile Mississippi-to-Alabama Gas Pipeline Moves Into FERC Review
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- LNG Canada Start-Up Fails to Lift Gas Prices Amid Supply Glut
- Strike Pioneers First-of-Its-Kind Pipe-in-Pipe Installation on Gulf Coast with Enbridge
Comments