NGL Energy Partners Announces Commissioning of Poker Lake Express Pipeline
(P&GJ) — NGL Energy Partners has begun receiving produced water from XTO Energy’s Poker Lake Development in the Delaware Basin.
These volumes represent full commissioning of NGL’s 30-inch pipeline, Poker Lake Express, which has been constructed to transport volumes associated with its 18-year Poker Lake acreage dedication.
This dedication includes first-call rights for produced water covering approximately 70,000 contiguous acres in Eddy County, NM.
The Partnership is utilizing the new Poker Lake Express Pipeline, which has an initial capacity of over 350,000 barrels per day and connects into its integrated Delaware Basin produced water pipeline infrastructure network.
The Partnership expects to expand its takeaway capacity with an additional pipeline as the Poker Lake Development progresses, ultimately increasing total takeaway capacity to over 700,000 barrels per day from this development.
“We are pleased to announce first flows from Poker Lake, which represents a major milestone for our Water Solutions business,” said Christian Holcomb, Senior Vice President and Chief Operating Officer, NGL Water Solutions.
NGL owns and operates the largest integrated network of large diameter produced water pipelines, recycling facilities and disposal wells in the Delaware Basin.
Related News
Related News
![](/media/2035/pgj-enews-graphic-300x1404.jpg)
- Mexican President: Billionaire Slim Interested in Pemex Natural Gas Project
- Freeport LNG Sues Three Contractors Over Defects at Texas Plant
- Energy Transfer Adds 6,000 Miles of Pipeline with $3.25 Billion WTG Midstream Acquisition
- FERC Approves Transco's Texas to Louisiana Gas Pipeline Project
- Williams Says Court Rules in Its Favor in Pipeline Dispute with Energy Transfer
- U.S. to Buy 4.5 Million Barrels of Oil to Replenish Strategic Petroleum Reserve
- Kurdish Oil Smuggling to Iran Flourishes
- U.S. Court Overturns Alaska Oil Lease Sale, Halting Energy Development
- Second Gas Pipeline Rupture in Texas’ Reeves County Raises Environmental Concerns
- Williams Begins Louisiana Pipeline Construction Despite Ongoing Legal Dispute with Energy Transfer
Comments