NGL Energy Partners Announces Commissioning of Poker Lake Express Pipeline
(P&GJ) — NGL Energy Partners has begun receiving produced water from XTO Energy’s Poker Lake Development in the Delaware Basin.
These volumes represent full commissioning of NGL’s 30-inch pipeline, Poker Lake Express, which has been constructed to transport volumes associated with its 18-year Poker Lake acreage dedication.
This dedication includes first-call rights for produced water covering approximately 70,000 contiguous acres in Eddy County, NM.
The Partnership is utilizing the new Poker Lake Express Pipeline, which has an initial capacity of over 350,000 barrels per day and connects into its integrated Delaware Basin produced water pipeline infrastructure network.
The Partnership expects to expand its takeaway capacity with an additional pipeline as the Poker Lake Development progresses, ultimately increasing total takeaway capacity to over 700,000 barrels per day from this development.
“We are pleased to announce first flows from Poker Lake, which represents a major milestone for our Water Solutions business,” said Christian Holcomb, Senior Vice President and Chief Operating Officer, NGL Water Solutions.
NGL owns and operates the largest integrated network of large diameter produced water pipelines, recycling facilities and disposal wells in the Delaware Basin.
Related News
Related News

- Poland Detects Leak in Russia's Druzhba Oil Pipeline
- Energy Transfer to Buy Crestwood in $7.1 Billion Pipeline Deal
- Magellan Midstream Approves $18.8 Billion Sale to ONEOK, Creating Major U.S. Pipeline Player
- DT Midstream Successfully Completes Phase 1 LEAP Expansion Ahead of Schedule
- Equitrans to Begin Construction on Ohio Valley Connector Expansion Project
- Canada Looking to Sell Trans Mountain Pipeline Stake to Indigenous Groups
- Energy Transfer to Buy Crestwood in $7.1 Billion Pipeline Deal
- Criteria to Consider in Selecting Water Transfer Flow Meters
- US Energy Firm Payouts to Oil Investors Top Exploration Spending for First Time
- DT Midstream Successfully Completes Phase 1 LEAP Expansion Ahead of Schedule
Comments