Fluor Wins Contract for New Fortress Energy Fast LNG Project
Fluor Corp. has been awarded a full notice-to-proceed (FNTP) contract by New Fortress Energy Inc. for the engineering, procurement and fabrication management of the NFE Fast LNG 2 project.

The project is a nominal 1.4 million tonnes per annum LNG gas treating and liquefaction plant to be placed on fixed offshore platforms. Fluor will book the undisclosed reimbursable contract value in the second quarter of 2022.
“Fluor, in conjunction with key licensors and suppliers, provides NFE with an integrated modular mid-scale LNG export solution for these projects,” Jim Breuer, Fluor’s Energy Solutions group president, said. “The Fluor design and execution plan facilitates repeatable project models that can be used to replicate similar plants in the future.”
The Fast LNG 2 project is another offshore modular mid-scale LNG plant that NFE has awarded to Fluor this year. The first NFE Fast LNG 1 project was awarded in the first quarter of this year and is a similar modular mid-scale design being installed on repurposed drilling jack-up rigs. This modular plant will be installed by others and available for dispatch to various locations around the world providing NFE the opportunity to access multiple gas supply sources.
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- U.S. Moves to Block Enterprise Products’ Exports to China Over Security Risk
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- US Poised to Become Net Exporter of Crude Oil in 2023
- EIG’s MidOcean Energy Acquires 20% Stake in Peru LNG, Including 254-Mile Pipeline
Comments