Greece, Bulgaria to Build New LNG Terminal to Help Cut Reliance on Russia
(Reuters) — A new LNG facility to be built off the northern Greek port of Alexandroupolis is expected to help create a new gas route for Europe and cut reliance on Russian gas at a crucial moment, Greece and Bulgaria said on Tuesday.
The new FSRU will be anchored about 18 km (11 miles) off Alexandroupolis port and carry gas to the shore via a 28-km long pipeline. The new terminal will be able to regasify 5.5 Bcm of LNG annually and store 153,500 cubic meters. It is expected to start operations at the end of 2023.
To date, Greece has one LNG terminal off Athens. With the new Alexandroupolis terminal and other projects in the pipeline, it could triple its regasification capacity by the end of 2023, Mitsotakis said.
The Alexandroupolis terminal will be built by Gastrade, owned by Greece's Copelouzos family, at a cost of 360 million euros ($378 million).
"The economic blackmail of the Kremlin against my country and the European Union will not succeed, because we will oppose it and today's event is a proof of that," Bulgarian Prime Minister Kiril Petkov said.
Russia's Feb. 24 invasion of Ukraine prompted the United States and its allies to impose the most severe sanctions in modern history on Russia.
Moscow has warned it will respond in kind and last week its gas exporter Gazprom cut off supplies to Bulgaria and Poland for refusing to pay in rubles, with gas prices soaring on fears more states could be hit.
"Our countries all together are ready to assume a new crucial role in Europe's new energy map," Greek Prime Minister Kyriakos Mitsotakis said at an event to mark the start of implementing the floating storage and regasification unit (FSRU) in Alexandroupolis.
"Recent blackmails by Moscow over natural gas make this cooperation not only necessary but urgent."
European Council President Charles Michel and the leaders of Bulgaria, Serbia and North Macedonia attended the ceremony.
Greece has been supplying Bulgaria with gas since it was cut off by Russia.
Greek gas utility DEPA, Bulgaria's Bulgartransgaz and Greek gas operator DESFA are also participating in the project, which will complement a new gas link between the Greek town of Komotini and Bulgaria's Stara Zagora, the so-called Interconnector Greece Bulgaria (IGB), expected to become operational later this year.
($1 = 0.9513 euros)
Related News
Related News
- Texas Waha Hub Gas Prices Plunge to Record Lows, Hit Negative Territory
- U.S. Appeals Court Strikes Down Controversial Biden Pipeline Safety Rules
- Texas Oil Pipelines Near Max Capacity, Threatening Future Export Limits
- Williams Seeks Emergency Certificate to Operate $1 Billion Mid-Atlantic Gas Pipeline After Court Reversal
- Energy Transfer Subsidiary Selects KTJV for Lake Charles LNG Export Project
- Saudi Arabia Looking to Expand Pipeline to Reduce Oil Exports via Gulf
- Report: Houston Region Poised to Become a Global Clean Hydrogen Hub
- Texas Startup Endeavors Again to Build First Major U.S. Oil Refinery Since 1977
- Puerto Bahia, Gasco to Build Liquefied Petroleum Gas Facility in Cartagena, Colombia
- Sempra's Costa Azul LNG Project Delayed by Labor Issues
Comments