PLIDCO Introduces Hydrogen-Compatible Fittings for Pipeline Maintenance and Repairs
(P&GJ) — The Pipe Line Development Company (PLIDCO) has launched a new range of products for use with hydrogen pipelines in response to the emerging transition toward hydrogen and other alternative energy sources.
Designed for onshore and subsea high-pressure emergency pipeline repairs and routine pipeline maintenance applications, PLIDCO’s products are ideal for hydrogen, oil, gas, water, chemical, steam, slurry and other piping systems. Its high-pressure fittings are designed and manufactured to meet the highest quality standards, following ASME/ANSI codes and adhering to a strict quality control program.
“As the shift toward a hydrogen-based energy system gains traction, we anticipate an emerging need for pipeline maintenance and repair products that meet the specific standards required for hydrogen pipelines,” Ernie Lackner, PLIDCO’s director of sales and marketing, said.
PLIDCO maintains an inventory of fittings compatible for use with hydrogen pipelines, allowing customers to stop leaks without shutdown or welding in onshore and subsea environments. Each of its hydrogen-approved products meets U.S. quality standards and has distinctive green markings to easily differentiate them, helping to ensure a mistake-proof repair.
The new line of hydrogen products is covered under PLIDCO’s five-year limited warranty, the only such warranty provided in the pipeline industry.
Related News
Related News
- Trump Aims to Revive 1,200-Mile Keystone XL Pipeline Despite Major Challenges
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- ONEOK Agrees to Sell Interstate Gas Pipelines to DT Midstream for $1.2 Billion
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Tullow Oil on Track to Deliver $600 Million Free Cash Flow Over Next 2 Years
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
Comments