Sudan Repairs Ruptured Oil Pipeline With Goals to Resume June 2024
May 28 (Reuters) - A Sudan oil pipeline ruptured during fighting in February has been repaired and could resume operation in the next two weeks, a South Sudan oil ministry official said on Tuesday.
The Petrodar pipeline, set up by a consortium including China's CNPC, Sinopec and Malaysia's Petronas, normally pumps about 100,000 barrels per day (bpd) of South Sudan's crude more than 1,500 km (932 miles) to a terminal on Sudan's Red Sea coast.
Sudanese sources aligned with the army blamed its rival Rapid Support Forces (RSF) for the stoppage, saying the pipeline's damaged pump station was in RSF-controlled territory. The RSF denied the claims.
South Sudan's Dar Blend, a waxy crude with low sulphur content, requires heating to stop it from solidifying in the pipeline.
"The rupture has been restored, has been repaired, but now it has caused some gelling along the pipeline," said William Anyak Deng, an undersecretary in South Sudan's oil ministry.
Oil is a vital source of revenue for South Sudan's government, representing 90% of its foreign exchange earnings, with Sudan taking a cut of the oil as a transit fee.
The Petrodar pipeline, one of two in Sudan, carries about two thirds of South Sudan's total oil exports.
Observers have warned that South Sudan faces economic meltdown and political turmoil unless a major source of its petrodollars is reinstated.
The 13-month war in Sudan has hampered efforts to fix the pipeline, but oil exports will resume once the wax has been drained from it, using either hot water or diesel, Deng told reporters.
"China will continue to provide its support and cooperation together with the partners to try to solve the problems and tackle the challenges," said Ma Qiang, China's ambassador to South Sudan.
Related News
Related News
- Phillips 66 to Shut LA Oil Refinery, Ending Major Gasoline Output Amid Supply Concerns
- FERC Sides with Williams in Texas-Louisiana Pipeline Dispute with Energy Transfer
- U.S. Appeals Court Blocks Kinder Morgan’s Tennessee Pipeline Permits
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- U.S. Appeals Court Blocks Kinder Morgan’s Tennessee Pipeline Permits
- Malaysia’s Oil Exports to China Surge Amid Broader Import Decline
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Marathon Oil to Lay Off Over 500 Texas Workers Ahead of ConocoPhillips Merger
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
Comments