Acciona, RCM to Construct $230 Million Breakwater for Italy’s Ravenna LNG Terminal
(Reuters) — Acciona and Italy's RCMCostruzioni will build a breakwater to protect the new liquefied natural gas (LNG) terminal located off the port of Ravenna, in a contract worth 216 million euros ($230 million), the Spanish group said on Tuesday.
The terminal, which will be managed by Italy's gas grid operator Snam, is expected to be ready in the first quarter of next year.
Imports of LNG, which arrives via ships and is regasified at terminals before being transported through pipeline to domestic customers, have become a major source of supply, covering around one fourth of Italy's annual gas consumption.
Ravenna's work consists of a vertical concrete quay, with a length of 880 meters and a width of 22 meters.
The project will be located 8.5 kilometers off the coast of Punta Marina, south of the port of Ravenna in the northern Adriatic Sea, and has a completion period of 24 months.
The contract is fully covered with funds granted by Italian state lender Cassa Depositi e Prestiti (CDP) to the North Central Adriatic Sea Port Authority, the client for the contract.
Acciona, whose Italian business is headed by Luigi Patìmo, provides water supply and treatment services to more than two million people in 10 Italian regions.
It has also carried out major infrastructure projects in the country, such as the railway junction linking Bologna to the Milan-Naples high-speed rail line and the expansion of Rome Fiumicino airport.
($1 = 0.9407 euros)
Related News
Related News
- Trump Aims to Revive 1,200-Mile Keystone XL Pipeline Despite Major Challenges
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- ONEOK Agrees to Sell Interstate Gas Pipelines to DT Midstream for $1.2 Billion
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Tullow Oil on Track to Deliver $600 Million Free Cash Flow Over Next 2 Years
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
Comments