Freeport LNG Reports Temporary Shutdown at Texas Facility Due to Power Fluctuation
(Reuters) — Freeport LNG reported on Monday that three LNG processing trains at its Quintana, Texas, facility were back online after temporary outages that began on Friday because of a power feed interruption.
Texas-based Freeport LNG operates the second-largest U.S. export facility and gets its power from the state's electrical grid. It has struggled this year with several processing outages caused by storms. Those outages at times lowered U.S. LNG exports.
"During operation of Freeport LNG's Pretreatment Facility, Trains 1, 2, and 3 tripped due to an incoming power feed interruption. The trips resulted in unavoidable venting to the Pretreatment Flare," Freeport told the Texas Commission on Environmental Quality.
Gas flows to Freeport were on track to rise to 1.8 Bcf/d on Monday, up from 0.3 Bcf/d on Nov. 1 and near zero on Nov. 2, according to data from financial firm LSEG.
Related News
Related News
- Trump Aims to Revive 1,200-Mile Keystone XL Pipeline Despite Major Challenges
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- ONEOK Agrees to Sell Interstate Gas Pipelines to DT Midstream for $1.2 Billion
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Tullow Oil on Track to Deliver $600 Million Free Cash Flow Over Next 2 Years
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
Comments