Crestwood Equity Completes Open Season on Pipeline Expansion

Crestwood Equity Partners completed a non-binding open season on Dec. 7 seeking shipper support for the Delaware Takeaway crude pipeline system (Delta), a 164-mile crude and condensate pipeline header system originating at a Crestwood terminal to be built north of Pecos, TX.
The pipeline would have potential downstream connections to multiple downstream interconnects that will provide shippers access to end markets including El Paso, Midland, Cushing, Houston and Corpus Christi.
Delta will have the capability to batch multiple grades of crude and condensate, and initially transport over 200,000 bpd, and the project may be expanded based on the results of the open season. Delta is expected to be operational in mid-2017.
Crestwood is also in negotiations with a large producer in the Delaware Permian Basin to anchor a three-stream gathering system spanning portions of the Texas counties of Reeves, Loving and Culberson that would aggregate crude and condensate volumes to the Orla Terminal, near Pecos. The system would consist of 600 miles of pipelines within 400,000 acres.
The Orla Terminal would initially provide 200,000 bbls of storage, truck-loading and unloading facilities, blending services, multiple upstream and downstream pipeline connections, and will potentially provide condensate stabilization services for Wolfcamp production.
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- TC Energy Approves $900 Million Northwoods Pipeline Expansion for U.S. Midwest
- New Alternatives for Noise Reduction in Gas Pipelines
- EIG’s MidOcean Energy Acquires 20% Stake in Peru LNG, Including 254-Mile Pipeline
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- DOE Considers Cutting Over $1.2 Billion in Carbon Capture Project Funding
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
Comments