Enbridge Installing Supports for Great Lakes Oil Pipeline
TRAVERSE CITY, Mich. (AP) — Enbridge says it has begun installing steel supports on an oil pipeline in Michigan's Straits of Mackinac, where erosion has created a gap between the line and the lake bottom.
The Canadian company based in Calgary, Alberta, said Tuesday it had received a permit from the U.S. Army Corps of Engineers to install 54 supports along the Line 5 pipe in the waterway connecting Lakes Huron and Michigan.
The work is needed because the space beneath the line exceeds than 75 feet in length, the maximum allowed under an agreement with the state. Company spokesman Ryan Duffy says the job should be finished later this week.
Enbridge previously has installed 147 screw anchors since 2002 on Line 5's dual pipes to deal with other gaps that formed beneath them.
Related News
Related News
- Texas Waha Hub Gas Prices Plunge to Record Lows, Hit Negative Territory
- Williams Seeks Emergency Certificate to Operate $1 Billion Mid-Atlantic Gas Pipeline After Court Reversal
- Texas Oil Pipelines Near Max Capacity, Threatening Future Export Limits
- Energy Transfer Subsidiary Selects KTJV for Lake Charles LNG Export Project
- FERC Sides with Williams in Texas-Louisiana Pipeline Dispute with Energy Transfer
- Saudi Arabia Looking to Expand Pipeline to Reduce Oil Exports via Gulf
- Report: Houston Region Poised to Become a Global Clean Hydrogen Hub
- Texas Startup Endeavors Again to Build First Major U.S. Oil Refinery Since 1977
- Alaska Greenlights Enstar’s $57 Million Pipeline to Boost LNG Imports
- Texas Waha Hub Gas Prices Plunge to Record Lows, Hit Negative Territory
Comments