Texas Railroad Commission Adopts New Pipeline Safety Rules
(P&GJ) — The Railroad Commission (RRC) of Texas has adopted new natural gas pipeline safety rules regarding the type of natural gas distribution pipelines that are allowed to be installed.
The new rules prohibit natural gas distribution pipeline operators from installing underground cast iron, wrought iron or bare steel pipelines. Other new pipeline safety requirements require operators to more thoroughly assess the potential public safety risk of gathering lines.
The Commission adopted these amendments on Dec. 17, 2019—weeks before a Dec. 31, 2019 statutory deadline for House Bills 864 and 866 passed by the 86th Legislature last year.
The RRC’s new pipeline rules also require these natural gas distribution pipeline operators to replace any known existing cast iron pipelines by Dec. 31, 2021.
“The Railroad Commission’s highest priority is public safety,” said RRC Executive Director Wei Wang. “These new amendments enhance our existing rules requiring pipeline operators to construct, operate and maintain their pipelines in compliance with Texas laws and regulations.”
“With more than 469,000 miles of pipelines, Texas’ pipeline infrastructure is key to delivering energy to Texans, the nation and world,” Wang said. “By taking truck traffic off the highways, pipelines continue to be one of the safest ways to transport crude oil and natural gas.”
According to the U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA), it would take a constant line of tanker trucks, about 750 per day, loading up and moving out every two minutes, 24 hours a day, seven days a week, to move the volume of even a modest pipeline.
Under the new measures, gathering line operators are also required to report incidents and accidents on gathering lines that result in a death or in-patient hospitalization, property damage of $50,000 or more, or estimated gas loss of three million cubic feet or more.
Operators must submit a corrective action plan to the Commission to remediate an accident, incident or threat that creates a public safety risk or address a public safety complaint.
The new rules took effect on Jan. 6, 2020.
The complete RRC’s Chapter 8 Pipeline Safety rules can be found at:
https://texreg.sos.state.tx.us/public/readtac$ext.ViewTAC?tac_view=4&ti=16&pt=1&ch=8
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- U.S. Moves to Block Enterprise Products’ Exports to China Over Security Risk
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- US Poised to Become Net Exporter of Crude Oil in 2023
- EIG’s MidOcean Energy Acquires 20% Stake in Peru LNG, Including 254-Mile Pipeline
Comments