New Mexico Close to Adopting Oil and Gas Water Rules
SANTA FE, N.M. (AP) — New Mexico regulators are close to adopting a set of rules focused on wastewater produced during oil and gas operations.
The Oil Conservation Commission is expected during its meeting in early September to vote on the final language after hashing out a draft during a virtual public meeting last week.
The rules would require additional reporting to better track the types and volumes of water used within the industry. The measure would also clarify the jurisdictions of the Oil Conservation Division and the state Environment Department when it comes to produced water.
Environmental groups have been critical, saying the proposed rules do not address concerns about the toxicity and the risks of reusing the water.
State officials have said the proposal would not authorize the use of produced water outside the oil and gas industry. They say the process before the oil commission marks just the first phase, leaving the door open to future rule making.
The Environment Department also is developing its own rules to regulate produced water and any potential effects on the environment.
According to state data, every barrel of oil produced results in an average of four barrels of produced water. In 2018, the industry in New Mexico generated more than 42 billion gallons of produced water.
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- New Alternatives for Noise Reduction in Gas Pipelines
- EIG’s MidOcean Energy Acquires 20% Stake in Peru LNG, Including 254-Mile Pipeline
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- DOE Considers Cutting Over $1.2 Billion in Carbon Capture Project Funding
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
Comments