ONEOK Seeks FERC Approval for 155-Mile Permian-Mexico Connector Pipeline
By Mary Holcomb, Digital Editor
(P&GJ) — Saguaro Connector Pipeline, a division of ONEOK Inc., submitted an application to the U.S. Federal Energy Regulatory Commission (FERC) to construct infrastructure that would transport more Permian Basin natural gas to Mexico.
Saguaro Connector Pipeline filed for a presidential permit application with FERC to construct and operate facilities for the exportation of natural gas at a new international border-crossing at the U.S. and Mexico border in Hudspeth County, Texas.
The proposed border facilities would connect upstream with a potential intrastate natural gas pipeline, the Saguaro Connector Pipeline, which would be designed to transport natural gas from ONEOK's existing WesTex intrastate natural gas pipeline system in the Permian Basin in West Texas to Mexico. Additionally, the proposed border facilities would connect at the International Boundary with a new pipeline under development in Mexico for delivery to an export facility on the West Coast of Mexico.
The potential Saguaro Connector Pipeline would consist of approximately 155 miles of 48-inch-diameter natural gas pipeline originating at the Waha Hub in Pecos County, Texas. The ultimate design capacity of the potential pipeline would be approximately 2.8 billion cubic feet per day. Final investment decision on the potential pipeline is expected by mid-2023.
ONEOK Inc. is a leading midstream service provider and owner of one of the nation's premier natural gas liquids (NGL) systems, connecting NGL supply in the Rocky Mountain, Mid-Continent and Permian regions with key market centers and an extensive network of natural gas gathering, processing, storage and transportation assets.
ONEOK is a FORTUNE 500 company and is included in the S&P 500.
Related News
Related News

- Kazakh Oil Decouples from Russian Crude But Risk Weighs on Price
- Repsol Ditches Plans to Develop LNG Terminal on Canada’s East Coast
- Pipeline Operator TC Energy Says Stress, Weld Fault Caused Keystone Oil Spill
- US to Sell 26 Million Barrels of Oil Reserves As Mandated by Congress
- Ukraine to Jointly Buy Gas with European Union Countries
- US Intelligence Suggests Pro-Ukrainian Group Sabotaged Nord Stream Pipelines -NYT
- EIA: US Natural Gas Output to Hit Record High in 2023, Demand to Fall
- US Regulator Orders Lower Pressure on Keystone Pipeline System After Spill
- US Carbon Pipeline Faces Setback as Residents Refuse to Cede Land Rights
- YPF CEO: Green Light for Argentina's Gas Project with Petronas to Come in 2024
Comments