Caspian Pipeline Consortium Halts Oil Loadings in Planned Shutdown
(Reuters) — The Caspian Pipeline Consortium (CPC), which handles 1% of global oil flows, has stopped oil loadings through its single mooring points (SPM) since April 10 because of a planned shutdown, it said on Wednesday.
"The CPC terminal has not loaded or received oil into storage tanks since April 10 because of a planned shutdown," a CPC press office statement said.
CPC Blend oil loadings are scheduled to resume on April 14 after maintenance, said two traders familiar with CPC terminal operations.
"The suspension was planned and won't affect the schedule," one of the traders said.
CPC, the main export route for Kazakhstan's oil, suspended loading operations several times last year for unplanned maintenance, forcing major Kazakh oil producers to cut output and look for alternative export routes.
Related News
Related News

- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- New Alternatives for Noise Reduction in Gas Pipelines
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Gazprom’s Grandeur Fades as Europe Moves Away from Russian Gas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
Comments