Chevron Resumes Natural Gas Supply from Israel's Tamar Offshore Field
(Reuters) — Chevron said on Monday it had resumed the supply of natural gas from the offshore Tamar field, a month after it was told by Israel to halt operations due to violence in the region.
The Tamar field, a major source of gas for Israel's power generators, is expected to reach full capacity within a few days, industry sources said. Around 20% of the gas from the field typically goes to neighboring Egypt and Jordan.
Israel's Energy Ministry had ordered a state of emergency for the sector and instructed Chevron to shut the field after the Oct. 7 attack by Hamas on Israeli territory, which sparked a conflict in the Gaza Strip and other parts of the region.
The platform, which can be seen from the northern Gaza Strip on a clear day, is within range of rocket fire. It is located about 25 km (15.5 miles) from the city of Ashdod along Israel's southern Mediterranean coast.
"We have resumed supplying customers in Israel and in the region from the Tamar production platform," Chevron said in a statement, adding that it was instructed by the Israeli government on Nov. 9 to resume operations.
Israel's largest offshore gas field, Leviathan, has continued to operate normally during the current conflict between Israel and Hamas, the militant Islamist Palestinian group that controls Gaza. Chevron operates and holds a 25% stake in Tamar, which delivers about 1% of its global output.
Without gas from Tamar, Israel relied more heavily on supplies from the Chevron-operated Leviathan field, which exports large volumes to Egypt, as well as Energean's Karish field.
Related News
Related News

- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- New Alternatives for Noise Reduction in Gas Pipelines
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Woodside May Delay Final Investment Decision on Louisiana LNG to Q2, CEO Says
- Panama Canal Considers Pipeline to Move U.S. Gas to Asia
Comments