Japanese Firms, Petronas to Launch CO2 Storage Project by Late 2028
(Reuters) — Japanese companies have agreed to develop a carbon capture and storage (CCS) project with Malaysian energy firm Petronas which should start holding its first carbon dioxide (CO2) emissions from end-2028, Japan Petroleum Exploration Co. said on Monday.
Japan plans to be carbon-neutral by 2050 and is actively developing renewable and alternative energy sources from hydrogen and ammonia to solar and wind power, with CCS technology also playing an important role in its strategy.
Japan Petroleum Exploration Co (JAPEX) is developing the CCS project with JGC Holdings Corp and Kawasaki Kisen Kaisha, or K Line, as well as state-controlled Petronas.
The companies plan to start the front-end engineering design next year with a goal to inject and store CO2 from Japan and Malaysia in depleted oil and gas fields off the Malaysian coast, the statement said.
JAPEX did not provide a cost estimate but said that at least 2 million metric tons of CO2 per year is planned to be injected at the start, rising to 5 million tons annually by the end of this decade and to over 10 million tones in early 2030s.
Early this year, Japan set a target of annual CO2 storage capacity of 6-12 million tonnes by 2030 under a long-term roadmap for CCS which removes CO2 emissions from the atmosphere and stores them underground.
Related News
Related News
- Trump Aims to Revive 1,200-Mile Keystone XL Pipeline Despite Major Challenges
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- ONEOK Agrees to Sell Interstate Gas Pipelines to DT Midstream for $1.2 Billion
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Tullow Oil on Track to Deliver $600 Million Free Cash Flow Over Next 2 Years
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
Comments