ONEOK Inc., completed the MB-6, a 125,000-bpd NGL fractionator in Mont Belvieu, Texas, and the full looping of the West Texas NGL Pipeline system.
The project increased the company’s fractionation capacity to more than 1 MMbpd, reducing the need for third-party fractionation and enhancing ONEOK’s ability to serve growing NGL market demand.
Completion of the full looping of the West Texas NGL Pipeline system expands the capacity to 515,000 bpd. Additional pump stations, which are expected to be completed in mid-2025, will further increase system capacity to 740,000 bpd.
Watch to learn how Southern Star Central Gas Pipeline, a key player in the natural gas industry, increased its maintenance efficiency by 25% using Hexagon’s enterprise asset management solutions.
Ready to see a BIG BOOM?! Watch Travis Jobe put Allan Edwards products to the test in their new YouTube series, Tested by Travis! In this episode, he pushes the OmegaWrap carbon composite system to its limits by placing a can of Tannerite inside of it and shooting it with an AR-15 rifle – for an explosion you won’t want to miss!
Watch the OmegaWrap carbon composite system lift a combined weight of 8,000+ pounds! Travis Jobe, Destruction Specialist at Allan Edwards, puts their products to the test in a new YouTube series, Tested by Travis!
When in doubt, run it over! Travis Jobe puts Allan Edwards products to the test in their new YouTube series, Tested by Travis! In this episode, watch Travis run over the OmegaWrap carbon composite repair system and see what happens!
STATS BISEP with integrated bypass is the true industry-first, leak-tight double block and bleed isolation technology. The BISEP provides significant safety advantages with seals that can be proven, tested and monitored before breaking containment. With an extensive global track record, covering 3” to 54” and pressures from ambient up to 2220 psi.
- Trump Aims to Revive 1,200-Mile Keystone XL Pipeline Despite Major Challenges
- ONEOK Agrees to Sell Interstate Gas Pipelines to DT Midstream for $1.2 Billion
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- Boardwalk Approves 110-Mile, 1.16 Bcf/d Mississippi Kosci Junction Pipeline Project
- Kinder Morgan Approves $1.4 Billion Mississippi Crossing Project to Boost Southeast Gas Supply
- Tullow Oil on Track to Deliver $600 Million Free Cash Flow Over Next 2 Years
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Enbridge Should Rethink Old, Troubled Line 5 Pipeline, IEEFA Says
- Energy Transfer Reaches FID on $2.7 Billion, 2.2 Bcf/d Permian Pipeline
- Polish Pipeline Operator Offers Firm Capacity to Transport Gas to Ukraine in 2025