First Subsea to Supply Pipeline Recovery Tool for Gulf of Mexico Pipeline
2/21/2017
First Subsea has received a contract from Allseas Group to provide a 42” Ballgrab Pipeline Recovery Tool for the Sur de Texas-Tuxpan pipeline project. The Sur de Texas-Tuxpan pipeline is a 435-mile subsea gas pipeline that will interconnect with the Nueces-Brownsville pipeline and the Tuxpan-Tula pipeline in the Gulf of Mexico.
The PRT is designed and built in a modular manner, accommodating different pipe specifications as well as permitting various pigging, dewatering and sealing scenarios. Ballgrab PRT’s were first utilized in 1994 and have been supplied for more than 125 major projects worldwide.
Related News
Related News
Sign up to Receive Our Newsletter
- Phillips 66 to Shut LA Oil Refinery, Ending Major Gasoline Output Amid Supply Concerns
- FERC Sides with Williams in Texas-Louisiana Pipeline Dispute with Energy Transfer
- U.S. Appeals Court Blocks Kinder Morgan’s Tennessee Pipeline Permits
- ConocoPhillips Eyes Sale of $1 Billion Permian Assets Amid Marathon Acquisition
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- U.S. LNG Export Growth Faces Uncertainty as Trump’s Tariff Proposal Looms, Analysts Say
- Marathon Oil to Lay Off Over 500 Texas Workers Ahead of ConocoPhillips Merger
- Valero Considers All Options, Including Sale, for California Refineries Amid Regulatory Pressure
- Another Major U.S. Oil Refinery Shutting Down as Lyondell Confirms Houston Closure
- Chevron CEO Wirth Under Fire as Hess Deal Delay Drags Down Stock Performance
Pipeline Project Spotlight
Owner:
East African Crude Oil Pipeline Company
Project:
East African Crude Oil Pipeline (EACOP)
Type:
TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions.
Length:
902 miles (1,443 km)
Capacity:
200,000 b/d
Start:
2022
Completion:
2025
Comments