Construction

Pipeline Software Keeps Alberta Project Efficient Despite Mud, Cold

McElhanney Geomatics Engineering faced cold weather, thigh-deep mud and an unforgiving timeline during a 74-mile pipeline project in northwest Alberta, Canada. Pipeline surveying software played a critical role in its success.

Shell Falcon Pipeline Gets Important FERC Approval

At least a small measure of celebration likely buzzed through the offices at Shell Pipeline Company when FERC granted a declaratory order for its Falcon Ethane Pipeline System. The 98-mile pipeline is fundamental to the success the company’s $6 billion ethane cracker plant under construction in Pennsylvania.

Tallgrass, Kinder Morgan to Develop Rockies Crude Transportation Service

Tallgrass Energy and Kinder Morgan agreed to jointly develop a solution to increase existing crude oil takeaway capacity in the growing Powder River and Denver-Julesburg basins and to add incremental capacity to the Williston Basin and portions of Western Canada.

Tellurian’s Driftwood LNG Receives FEIS for Export Facility, Pipeline

Tellurian announced U.S. Federal Energy Regulatory Commission (FERC) issued the final environmental impact statement for Driftwood LNG, a 27.6 mtpa export facility and an associated 96-mile Driftwood pipeline project, proposed near Lake Charles, La., on the U.S. Gulf Coast.

2019 Global Pipeline Construction Outlook

The upstream sector started the new year on a cautious note following a sharp decline in oil and gas prices, but the midstream sector roared into 2019 on a wave of pipeline construction activity. The latest Pipeline & Gas Journal survey indicates 145,353 miles of pipelines were planned or under construction worldwide at the start of the year.

Israel Minister: Gas Exports to Egypt to Start Within Months

Israel will begin exporting natural gas to Egypt in a few months' time, Energy Minister Yuval Steinitz said, marking a key step in the plans to sell expanding gas production and bolster diplomatic ties.

Open Season Launched for ACE Pipeline System in Louisiana

Phillips 66 Partners, Harvest Midstream and PBF Logistics commenced an open season for the ACE Pipeline System after agreeing to jointly develop the 400,000 bpd Louisiana project.

TAP Gas Pipeline Completes $4.5 Billion Project Financing

The Trans-Adriatic Pipeline (TAP) has completed its $4.5 billion (3.9 billion euros) project financing, paving the way for construction to be completed for start-up in 2020, its managing director said on Friday.

WhiteWater Holds Open Season for NM-Texas Pipeline

WhiteWater Midstream commenced a binding open season for a 500,000 MMBtu/d pipeline from multiple points in Eddy County, N.M., to delivery points in northern Culberson County, Texas.

Keystone XL Hearing may Proceed Despite Government Shutdown

Justice Department attorneys say the U.S. government shutdown shouldn't delay a court hearing on a judge's decision to halt Keystone XL pipeline construction.

Judge Allows Tribes to Challenge Corps’ Dakota Access Study

A federal judge is allowing four Native American tribes in the Dakotas to challenge the recent conclusion of federal officials that a Dakota Access oil pipeline spill wouldn't unfairly affect them, further prolonging a court case that has lingered for more than two years.

Dakota Access Tree Replacement Lags Deadlines

The company hired to replace trees cut along the Dakota Access pipeline route has struggled to meet its deadline for reasons ranging from equipment and staffing issues to pushback from some landowners and agencies.

Maryland Board Rejects TransCanada Project Easement

Maryland's Board of Public Works voted against a proposed pipeline easement across the western part of the state that would enable TransCanada to transport natural gas from Pennsylvania to West Virginia.

Nord Stream 2 No Longer Easily Stopped, EU Budget Chief Says

Donald Trump’s criticism of the Russian-backed Nord Stream 2 pipeline is no reason to stop the project and any attempt to do so would be difficult now that it is being built, European Commissioner Guenther Oettinger said.

Projects

Valley Crossing Pipeline to Mexico Gains FERC Extension The Federal Energy Regulatory Commission (FERC) awarded Enbridge subsidiary Valley Crossing Pipeline six additional months to connect its natural gas pipeline to its counterpart in Mexico, moving the deadline to April 23. The 168-mile pipelin..

Global News

Natural Gas Utilities Testing Demand Response Programs Demand Response (DR) programs have become a fairly common method of reducing electricity demand during summer peak periods, and now the approach is being tried by natural gas utilities – most recently due to concerns about limited pipeline capa..

Cordillerano Pipeline Extension will be Delivered in March 2019

Growing natural gas demand in Argentina has led its Ministry of Energy to expedite expansion of the Patagonian System and the Rio Senger and Las Armas compressor plants.

Tunisia Pushes Forward with New Pipeline

Tunisia is positioning itself to be North Africa’s next gas producing and processing hub as the country anticipates the soon-to-be completion and commissioning of the Southern Tunisian Gas Pipeline.

San Mateo Midstream Completes Crude Oil Pipeline System in New Mexico

San Mateo Midstream’s Black River Oil Pipeline has been placed its Rustler Breaks Pipeline System into service in Eddy County, N.M., following a successful open season earlier this year.

Phillips 66 Sets $1.6 Billion Midstream Budget for 2019

Phillips 66 announced that it has set a $2.3 billion capital budget for 2019 and will direct the bulk of that spending to midstream growth projects.

Bulgaria to Seek Binding Bids for TurkStream Link by Jan 16

Bulgaria's state gas network operator plans to launch a binding open season this month for a 300-mile link that would transport mainly Russian gas from the TurkStream pipeline to central Europe.

Mountain Valley Pipeline Project to Be 70% Complete by Year-End

Mountain Valley Pipeline (MVP) officials said the company remains on target for the $4.6 billion project in fully in-service in the fourth quarter of 2019.

Kenyan Pipeline, Insurance Fund Officials Charged Over Graft

A Kenyan court has charged senior officials from the state-run oil pipeline and others from the state health insurance fund for abuse of office and economic crimes that led to the loss of billions of shillings from the two institutions.

Pennsylvania Judge Rejects Shutting Mariner East Pipelines

A Pennsylvania administrative law judge denied a petition by state residents asking utility regulators to prohibit the operation of Energy Transfer LP and its Sunoco subsidiary's Mariner East pipelines.

Michigan Legislature Passes Great Lakes Oil Pipeline Bill

The Michigan Legislature approved a bill that would allow the replacement of a 65-year-old oil pipeline in a key Great Lakes waterway, voting to create a state authority that would oversee the construction of a tunnel to encase a new segment of pipe.

Pipeline Company 'Trespassers' Handed $150 Fines by Judge

A Louisiana judge ruled a company building an oil pipeline through south Louisiana trespassed on the land of three people opposed to the project, but he allowed the work to continue while awarding the three only $150 apiece in compensation and damages.

Michigan Senate OK's Bill to Enable Great Lakes Pipeline Deal

The Michigan Senate voted to facilitate a deal to replace a contentious 65-year-old oil pipeline in the Great Lakes, approving legislation to empower a new authority to oversee the construction and operation of a utility tunnel that would encase the new pipeline.

Eni's Indonesia Gas Project to Start Up in 2021: Deputy Minister

Indonesia's deputy energy minister said Eni aims to start output of natural gas in 2021 from its offshore Merakes project, which includes construction of subsea systems and pipelines.

Jupiter Announces Open Season for Permian-Gulf Coast Crude Pipeline

Jupiter Energy Group announced it has commenced a 90-day open season for binding shipper commitments on a potential 1 Mmb/d crude oil pipeline from West Texas to the Port of Brownsville.

Keystone XL Prep Work Resumes Despite Court-Ordered Review

A federal court judge who ordered another environmental review of Keystone XL pipeline told TransCanada it can resume some U.S. pre-construction activities that had been blocked by his initial ruling.

Search